Tag: framing

Sep 28 2017

Standoff Second Story Braced Deck

completed with railing

The Backstory

This building was built 20 years ago with the intention of a deck accessed by…

May 15 2017

Adding Three Windows

The same house as the Trusses in Place project, required new windows. The new kitchen window was  a replacement window…

Nov 10 2016

Roof Over a Pop Out

Shed roof over pop out. The owner of this travel trailer was tired of fighting with leaks that developed in…

Mar 14 2016

Leaks in a Bathroom

The owner of this bathroom admitted he may have procrastinated on repairing what seemed like smallish problems until water stains…

Aug 27 2015

Custom Crawl Space Access Doors

Finished Doors

A wall on this camp was never or was no longer attached to the building so would swing in the…

Load more